- Contact Person : Ms. Zhao Cherry
- Company Name : Shangqiu Sihai Machinery Equipment Manufacturing Co., Ltd.
- Tel : 86-370-3163239
- Fax : 86-370-3163231
- Address : Henan,shangqiu,Steel Market, Pingyuan Rd, Shangqiu, Henan, Chia
- Country/Region : China
- Zip : 476000
Related Product Searches:Newest Research of Waste Tire Pyrolysis Plant In 2013,High Quality,tire pyrolysis plant, rubber pyrolysis plant,LJ-10
Founction:
recycle the waste tire/tyre,rubber,plastic ,foil aluminum into fuel oil with high valued.
Raw Meterial can be used:
A. The materials consists of plastic and rubber such as rubber, waste tyres, and waste rubber soles and so on. The oil production of the tyres beyond dia650mm is around 45%;The oil production of the tyres of the bikes, motorcycles and cars is 35%; The oil production of rubber soles is around 27-33%; The oil production of black rubber is about 35%; The oil production of gum outsole is around 45%.
B.Plastics: Since there exists great differences between the waste plastics, so the oil production also differs a lot. Generally speaking, it is between 35-85%.
Products parameters:
1.The fuel oil extracted from the waste plastics: Density: 0.80±0.02,dark red color, fuel value is 8500kcal.
2. The fuel oil extracted from the waste rubber: Density: 0.90±0.02,black color, fuel value is 10500-10100kcal.
Main model with specificiation :
Model No. | Capacity Per batch | Reactor Size Diameter with length | Reactor Thickness | Reactor Quality |
Generation Four | 5ton | 2200mm*6600mm | 14mm | Q245R boiler steel |
Generation Five | 5ton | 2200mm*6600mm | 14mm | Q245R boiler steel |
Generation Four | 10ton | 2600mm*6600mm | 16mm | Q245R boiler steel |
Generation five | 10ton | 2600mm*6600mm | 16mm | Q245R boiler steel |
The simple drawing for Generation Four
The price for generation four was feeding by munual ,and discharge by screw converyor .which with front side discharging system .
The main drawing for Generation Five as below:
The price in Generation Five included :Hydrolic feeding , side carbon black discharge system ,auto impulse collection system .which can discharge carbon black without any pollution ,but hydrolic feeding ,and auto impulse collection system was opptional.
The advantages of Generation five compared with Generation four.
1.with better heat holding .which can save heating time for reactor 4-5 hours .
2.side discharging system which will be cleaner than before .
3.the installation time:which can save 5 days at least .
4.Extral another two process for smoke before release to avoid pollution .
The related certification
Our competitive points from others
1.outside gear support for reactor which can ensure the reactor was stable during it was running
2.more than two discharge system which short the discharge time 0.5 hours at least
3.steam boiler system which can doow down the reactor within 2hours .
4.extral steam feeding system after finish the whole produce which remove the burn gas in the
reactor to avoid any fire injurt .it give all of the new user 100% safety .
5.spares parts for one year running freely
6.the perfect carbon black discharge system which can make the our work aera was clean
Newest Research of Waste Tire Pyrolysis Plant In 2013